Repair&Installation
Guarantee product maintenance policy

Installation process of villa elevator


1. While making the preliminary decoration plan, it is important to contact a household elevator surveyor to determine the size and location of the elevator installation at the doorstep. After confirming that there are no errors, the measurement personnel begin to report the measurement data, and then the designer presents the official elevator shaft construction drawing.


2. After the installation plan for the household elevator is determined, the signing of the contract and payment of the deposit shall prevail. Starting from the date of delivery of the deposit, the home elevator will begin production (the production and delivery cycle for home elevators is 50 days). At the same time, the technical personnel of the household elevator company can cooperate with the civil construction party to provide on-site guidance at any time.


3. After the overall civil construction is completed, the household elevator can be installed at any time, with an installation period of 7-10 days. After the installation of the villa elevator is completed, the installation personnel will cut off the power supply and block the elevator. After the indoor decoration is completed, the maintenance personnel will conduct the final debugging and hygiene cleaning of the elevator. After completion, it will be delivered to the owner for normal use.

Capanelli Home Elevator (Shanghai) Co., Ltd. has been engaged in the production, manufacturing, and installation of villa home elevators for many years, providing professional services and brand protection. We look forward to your visit!


Online Service
24-hour online service